{"id":7856,"date":"2022-03-13T09:51:42","date_gmt":"2022-03-13T06:51:42","guid":{"rendered":"https:\/\/www.ersaconstruction.net\/?p=7856"},"modified":"2022-12-15T13:27:24","modified_gmt":"2022-12-15T10:27:24","slug":"road-modernization-project-lutendele-drc","status":"publish","type":"post","link":"https:\/\/www.ersaconstruction.net\/?p=7856","title":{"rendered":"Road Modernization Project Lutendele &#8211; Drc"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"7856\" class=\"elementor elementor-7856\" data-elementor-settings=\"[]\">\n\t\t\t<div class=\"elementor-inner\">\n\t\t\t\t<div class=\"elementor-section-wrap\">\n\t\t\t\t\t\t\t<section class=\"elementor-element elementor-element-355e8fd elementor-section-boxed elementor-section-height-default elementor-section-height-default elementor-section elementor-top-section\" data-id=\"355e8fd\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5a207bc elementor-column elementor-col-100 elementor-top-column\" data-id=\"5a207bc\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap  elementor-element-populated\">\n\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t<div class=\"elementor-element elementor-element-6d176a0 elementor-widget elementor-widget-text-editor\" data-id=\"6d176a0\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-text-editor elementor-clearfix\"><p style=\"text-align: justify;\"><span style=\"color: #172964;\"><strong>The project is part of the opening up of neighborhoods and cities in the city of Kinshasa. The districts of Mbudi, Mazal and Lutendele were cut off from the surrounding populations with this road project.<br \/><br \/>At the beginning of the design of this project, a special focus was placed on project details such as Drainage structures (chutes) and engineering structures (culverts and culverts) and the construction of a 58 m span bridge over the Binza River.<br \/><br \/>The locality of Lutendele is full of enormous economic potential due to the fact that it is an agricultural area where there are several farms; The construction of this road will open up this area and facilitate trade between the districts of the urban-rural commune of Mont Ngafula and the city center. This road is a shortcut to Congo Central province from Pompage, its construction will relieve congestion on the Laurent Desire Kabila road, the UPN roundabout and the RN1 at Matadi Kibala. Its construction will help improve the living conditions of the local population and will facilitate movement and accessibility to economic centers, educational establishments and other centers of activity in the city.<\/strong><\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-element elementor-element-e6e24d8 elementor-section-boxed elementor-section-height-default elementor-section-height-default elementor-section elementor-top-section\" data-id=\"e6e24d8\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t<div class=\"elementor-row\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3af1f7c elementor-column elementor-col-100 elementor-top-column\" data-id=\"3af1f7c\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-column-wrap  elementor-element-populated\">\n\t\t\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t<div class=\"elementor-element elementor-element-37524c1 gallery-spacing-custom elementor-widget elementor-widget-image-gallery\" data-id=\"37524c1\" data-element_type=\"widget\" data-widget_type=\"image-gallery.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-gallery\">\n\t\t\t<div id='gallery-1' class='gallery galleryid-7856 gallery-columns-3 gallery-size-full'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-02\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-02.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"435\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-02.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-02.jpg 740w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-02-300x176.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-02-18x12.jpg 18w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-03\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-03.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"435\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-03.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-03.jpg 740w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-03-300x176.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-03-18x12.jpg 18w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-04\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-04.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"435\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-04.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-04.jpg 740w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-04-300x176.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-04-18x12.jpg 18w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-07\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-07.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"435\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-07.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-07.jpg 740w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-07-300x176.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-07-18x12.jpg 18w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-05\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-05.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"435\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-05.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-05.jpg 740w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-05-300x176.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-05-18x12.jpg 18w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-06\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-06.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"740\" height=\"434\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-06.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-06.jpg 740w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-06-300x176.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-06-18x12.jpg 18w\" sizes=\"auto, (max-width: 740px) 100vw, 740px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"37524c1\" data-elementor-lightbox-title=\"road-modernization-project-lutendele-01\" href='https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"1044\" height=\"727\" src=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01.jpg\" class=\"attachment-full size-full\" alt=\"\" srcset=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01.jpg 1044w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01-300x209.jpg 300w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01-1024x713.jpg 1024w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01-768x535.jpg 768w, https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-01-18x12.jpg 18w\" sizes=\"auto, (max-width: 1044px) 100vw, 1044px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The project is part of the opening up of neighborhoods and cities in the city of Kinshasa. The districts of Mbudi, Mazal and Lutendele were cut off from the surrounding populations with this road project. At the beginning of the design of this project, a special focus was placed on project details such as Drainage [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":7857,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"template\/case-study-template.php","format":"standard","meta":{"footnotes":""},"categories":[117],"tags":[],"class_list":["post-7856","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-under-development-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Road Modernization Project Lutendele - Drc - Ersa Construction<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ersaconstruction.net\/?p=7856\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Road Modernization Project Lutendele - Drc - Ersa Construction\" \/>\n<meta property=\"og:description\" content=\"The project is part of the opening up of neighborhoods and cities in the city of Kinshasa. The districts of Mbudi, Mazal and Lutendele were cut off from the surrounding populations with this road project. At the beginning of the design of this project, a special focus was placed on project details such as Drainage [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ersaconstruction.net\/?p=7856\" \/>\n<meta property=\"og:site_name\" content=\"Ersa Construction\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-13T06:51:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-15T10:27:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-cover.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"740\" \/>\n\t<meta property=\"og:image:height\" content=\"738\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ErsaAdminConstruction\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ErsaAdminConstruction\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856\"},\"author\":{\"name\":\"ErsaAdminConstruction\",\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/#\\\/schema\\\/person\\\/145fea632227afbaab8bede0776e08a2\"},\"headline\":\"Road Modernization Project Lutendele &#8211; Drc\",\"datePublished\":\"2022-03-13T06:51:42+00:00\",\"dateModified\":\"2022-12-15T10:27:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856\"},\"wordCount\":195,\"image\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ersaconstruction.net\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/road-modernization-project-lutendele-cover.jpg\",\"articleSection\":[\"Under Development Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856\",\"url\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856\",\"name\":\"Road Modernization Project Lutendele - Drc - Ersa Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.ersaconstruction.net\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/road-modernization-project-lutendele-cover.jpg\",\"datePublished\":\"2022-03-13T06:51:42+00:00\",\"dateModified\":\"2022-12-15T10:27:24+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/#\\\/schema\\\/person\\\/145fea632227afbaab8bede0776e08a2\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?p=7856#primaryimage\",\"url\":\"https:\\\/\\\/www.ersaconstruction.net\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/road-modernization-project-lutendele-cover.jpg\",\"contentUrl\":\"https:\\\/\\\/www.ersaconstruction.net\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/road-modernization-project-lutendele-cover.jpg\",\"width\":740,\"height\":738},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/#website\",\"url\":\"https:\\\/\\\/www.ersaconstruction.net\\\/\",\"name\":\"Ersa Construction\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ersaconstruction.net\\\/#\\\/schema\\\/person\\\/145fea632227afbaab8bede0776e08a2\",\"name\":\"ErsaAdminConstruction\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b0148a38cdc32aaadaee90cb8ab18565ea2430252078e5d64dababcf1a430e16?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b0148a38cdc32aaadaee90cb8ab18565ea2430252078e5d64dababcf1a430e16?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b0148a38cdc32aaadaee90cb8ab18565ea2430252078e5d64dababcf1a430e16?s=96&d=mm&r=g\",\"caption\":\"ErsaAdminConstruction\"},\"url\":\"https:\\\/\\\/www.ersaconstruction.net\\\/?author=4\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Road Modernization Project Lutendele - Drc - Ersa Construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ersaconstruction.net\/?p=7856","og_locale":"en_US","og_type":"article","og_title":"Road Modernization Project Lutendele - Drc - Ersa Construction","og_description":"The project is part of the opening up of neighborhoods and cities in the city of Kinshasa. The districts of Mbudi, Mazal and Lutendele were cut off from the surrounding populations with this road project. At the beginning of the design of this project, a special focus was placed on project details such as Drainage [&hellip;]","og_url":"https:\/\/www.ersaconstruction.net\/?p=7856","og_site_name":"Ersa Construction","article_published_time":"2022-03-13T06:51:42+00:00","article_modified_time":"2022-12-15T10:27:24+00:00","og_image":[{"width":740,"height":738,"url":"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-cover.jpg","type":"image\/jpeg"}],"author":"ErsaAdminConstruction","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ErsaAdminConstruction","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ersaconstruction.net\/?p=7856#article","isPartOf":{"@id":"https:\/\/www.ersaconstruction.net\/?p=7856"},"author":{"name":"ErsaAdminConstruction","@id":"https:\/\/www.ersaconstruction.net\/#\/schema\/person\/145fea632227afbaab8bede0776e08a2"},"headline":"Road Modernization Project Lutendele &#8211; Drc","datePublished":"2022-03-13T06:51:42+00:00","dateModified":"2022-12-15T10:27:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ersaconstruction.net\/?p=7856"},"wordCount":195,"image":{"@id":"https:\/\/www.ersaconstruction.net\/?p=7856#primaryimage"},"thumbnailUrl":"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-cover.jpg","articleSection":["Under Development Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.ersaconstruction.net\/?p=7856","url":"https:\/\/www.ersaconstruction.net\/?p=7856","name":"Road Modernization Project Lutendele - Drc - Ersa Construction","isPartOf":{"@id":"https:\/\/www.ersaconstruction.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.ersaconstruction.net\/?p=7856#primaryimage"},"image":{"@id":"https:\/\/www.ersaconstruction.net\/?p=7856#primaryimage"},"thumbnailUrl":"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-cover.jpg","datePublished":"2022-03-13T06:51:42+00:00","dateModified":"2022-12-15T10:27:24+00:00","author":{"@id":"https:\/\/www.ersaconstruction.net\/#\/schema\/person\/145fea632227afbaab8bede0776e08a2"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ersaconstruction.net\/?p=7856"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.ersaconstruction.net\/?p=7856#primaryimage","url":"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-cover.jpg","contentUrl":"https:\/\/www.ersaconstruction.net\/wp-content\/uploads\/2022\/12\/road-modernization-project-lutendele-cover.jpg","width":740,"height":738},{"@type":"WebSite","@id":"https:\/\/www.ersaconstruction.net\/#website","url":"https:\/\/www.ersaconstruction.net\/","name":"Ersa Construction","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ersaconstruction.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.ersaconstruction.net\/#\/schema\/person\/145fea632227afbaab8bede0776e08a2","name":"ErsaAdminConstruction","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b0148a38cdc32aaadaee90cb8ab18565ea2430252078e5d64dababcf1a430e16?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b0148a38cdc32aaadaee90cb8ab18565ea2430252078e5d64dababcf1a430e16?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b0148a38cdc32aaadaee90cb8ab18565ea2430252078e5d64dababcf1a430e16?s=96&d=mm&r=g","caption":"ErsaAdminConstruction"},"url":"https:\/\/www.ersaconstruction.net\/?author=4"}]}},"_links":{"self":[{"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/posts\/7856","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=7856"}],"version-history":[{"count":8,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/posts\/7856\/revisions"}],"predecessor-version":[{"id":8035,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/posts\/7856\/revisions\/8035"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=\/wp\/v2\/media\/7857"}],"wp:attachment":[{"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=7856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=7856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ersaconstruction.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=7856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}